Road Repairs Update

From
Pennsbury Village

Pennsbury Village Logo

Sent
Tue, Nov 10 @ 7:41pm

Description
On Wednesday, November 11th and Thursday, November 12th. residents on Pennsbury Blvd. may notice some minor traffic delays as two storm sewers are repaired. Both catch basins are located at the sides of the road so no closures are anticipated.

Next Week’s Schedule

On Tuesday, November 17th. and Wednesday, November 18th. the Carriage Circle/Pennsbury Blvd intersection will once again be closed to thru traffic for the replacement of a storm sewer. This catch basin is located on the hill, coming down from Pennsbury Blvd. and above the cal-de-sac entrance for building #38. Cal-de-sac parking should not be affected.

Because this catch basin is located in the middle of the road, we must close Carriage Circle to travel in this area. When closed, traffic that would normally access Carriage Circle and the cal-de-sac parking from Pennsbury Blvd. will have to go around to the far end of Carriage Circle (past the commercial area and down the steep hill). To exit the Village from Carriage Circle, please travel clockwise around Carriage Circle.

We are sorry for the inconvenience this is going to cause but we need to get this done before it becomes a safety issue.

You can check the status of road repairs on the Borough's website:
https://pennsburyvillageboro.com/news/2026/10/patch-paving-throughout-the-village-starting-monday-oct-19/

This notification was posted by Pennsbury Village. Pennsbury Village is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.

Back to Pennsbury Village's Calendar