Road Paving to begin Monday 8/12
From
Tullytown
Sent
Fri, Aug 9 @ 11:03am
Description
Road paving will begin in the Borough on Monday, August 12th, weather permitting.
The streets will be posted and will be done in the following order:
Leaf Lane
Lakeside Drive (South) and Low Lane
Lakeside Drive (West)
Stonybrook Drive
Serpentine Lane
Spur Lane
Cars must be removed from the street before 7 AM. Any car not removed will be towed.
There will be no bulk or yard waste pickup on Thurs., 8/15.
Any questions, call 215-945-1560. Updates to schedule will be posted on Savvy Citizen.
This notification was posted by Tullytown. Tullytown is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.