Tentative Road Paving Schedule

From
Spring Garden

Spring Garden Logo

Sent
Wed, Jun 28 @ 9am

Description
Spring Garden Township will be commencing the 2023 Road Paving and Maintenance work.
The following is the tentative schedule based on cooperative weather conditions.

6/30/2023:
Southern Road (Hollywood Dr. to Randow Rd.)
Everett Road (entire length)

7/5/2023:
Upperidge Lane (entire length)
Shelbourne Drive (Sleepy Hollow Rd. to Scarboro Dr.)

7/6/2023:
Wiltshire Road (entire length)
Brookway Drive (entire length)

This notification was posted by Spring Garden. Spring Garden is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.

Back to Spring Garden's Calendar