2026 Drainage Improvements Update
From
Lower Swatara Township
Sent
Sat, Jun 6 @ 12pm
Description
JVI Group, is scheduled to begin tree clearing efforts Monday and Tuesday of next week as part of the Township's planned drainage projects. Excavation and installation of stormwater facilities will begin mid-week along Lakeside Drive.
Please expect traffic delays during this time as the work will require flagging and possibly a full closure in the following weeks. The contractor will coordinate with local residents as needed to ensure home access. Thank you for your patience as we work to improve our stormwater systems.
Click the link below for more information about these projects:
https://lowerswatara.org/announcements/drainage-improvement-projects/
This notification was posted by Lower Swatara Township. Lower Swatara Township is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.