PennDOT Updates
From
Braddock Hills
Sent
Fri, May 15 @ 9:30am
Description
Beginning: Friday, May 15th through Monday, May 18th – I-376 will be reduced to a single lane of traffic in each direction between the Churchill (Exit 79B) exit and Wilkinsburg (Exit 78B) interchange from 9:00 PM Friday night continuously through 5:00 AM Monday morning.
If work concludes ahead of schedule, the restrictions will be lifted early (see attached press release).
This notification was posted by Braddock Hills. Braddock Hills is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.