Dorman Drive - Water Line Replacement/Services
From
Elizabeth Township
Sent
Thu, Oct 16 @ 10:32am
Where
View on Map
Description
JR Contracting will be installing new waterlines and services on Dorman Drive. The entire length from Rock Run throughout the loop will be impacted.
Proposed starting date is October 27th and expected conclusion is November 28th.
Temporary asphalt installed in ditch during construction. Please exercise caution when traveling on Dorman Drive.
Thanks!
This notification was posted by Elizabeth Township. Elizabeth Township is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.