Dorman Drive - Water Line Replacement/Services

From
Elizabeth Township

Elizabeth Township Logo

Sent
Thu, Oct 16 @ 10:32am

Where
View on Map

Description
JR Contracting will be installing new waterlines and services on Dorman Drive. The entire length from Rock Run throughout the loop will be impacted.

Proposed starting date is October 27th and expected conclusion is November 28th.

Temporary asphalt installed in ditch during construction. Please exercise caution when traveling on Dorman Drive.

Thanks!

This notification was posted by Elizabeth Township. Elizabeth Township is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.

Back to Elizabeth Township's Calendar