I-35 Lane Closures in Waco

From
Bruceville-Eddy

Bruceville-Eddy Logo

Sent
Fri, Jul 11 @ 7:36am

Where
View on Map

Description
I-35 WACO SOUTH | The Texas Department of Transportation (TxDOT) will begin shifting all northbound traffic to the southbound side of I-35 from 12th Street to S Loop 340 as part of the My35 Waco South Construction Project on Saturday, July 12, 2025, at 7 p.m. Various lane and ramp closures within the project limits will occur during this time. The shift is expected to be complete and roadways reopened by 10 a.m. on Sunday, July 13.

Preparation Work

Friday, July 11, 2025
• Entrance ramp to S Loop 340 south of Bagby Avenue and the left lane on S Loop 340 will close at 8 a.m. Expect temporary lane shifts and reduced speeds in the area.

• S Loop 340 to northbound I-35 direct connect will close at 7 p.m. and remain closed until further notice.
Once traffic is shifted, the following northbound ramp closures will remain in place for approximately two years:
CLOSED – Loop 340 direct connect to northbound I-35

• Drivers will be directed to exit at I-35 South just east of Bagby Avenue and use the cloverleaf to access northbound I-35
CLOSED – Northbound I-35 exits to New Road (Exit 331) and to Valley Mills Drive/La Salle Avenue (Exit 333A)

• Drivers will be directed to exit at S Loop 340/Marlin (Exit 330A)
CLOSED – Northbound I-35 exit for 17th/18th Streets (Exit 334A)

• Drivers will be directed to exit at 24th – 19th Streets (Exit 333B)
CLOSED – Eastbound S. Valley Mills Drive direct connect to northbound I-35

Attachments

This notification was posted by Bruceville-Eddy. Bruceville-Eddy is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.

Back to Bruceville-Eddy's Calendar