GAS UTILITY WORK IN CRAFTON
From
Borough of Crafton
Sent
Wed, Oct 16 @ 8:44am
Where
View on Map
Description
GAS UTILITY WORK IN CRAFTON
To all residents on N. Emily Street, N. Linwood Avenue and Coulter Street, in case you did not receive a robo-call or letter, please view this Savvy post as notice that People’s Natural Gas (PNG) has begun mainline replacement work on these roads. The work has been scheduled to run from 10/15/24 to 11/25/24 and includes both road and sidewalk disturbance. Please be aware of road closings, steel plates, open excavations, uneven ground and construction equipment. In regards to Halloween Trick or Treating, PNG has stated that “a concerted effort will be made to make sure that the streets and sidewalks are prepared for customers to walk and navigate their neighborhood in a clean and safe manner.”
Please see the attached drawings that show the proposed work along the affected streets.
This notification was posted by Borough of Crafton. Borough of Crafton is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.