Senator Fontana Announces $2.3 million Grant Award for Crafton Borough
From
Borough of Crafton
Sent
Tue, Dec 19 @ 3:04pm
Description
Crafton Borough is excited to announce that, thanks to the support of Senator Fontana, Crafton has been awarded $2.3 million for the Broadhead sewer separation project. This contribution will help the Borough complete a very important sewer separation and infrastructure project and move the community one step closer to compliance with our consent decree.
Crafton Borough would like to extend its heartfelt thanks to Senator Fontana for all his help with obtaining the funding.
Senator Fontana also helped the following awardees in the 42nd Senatorial District including:
• Mt. Lebanon received $300,000 for sanitary sewer rehabilitation project at Beggs Snyder Park.
• Carnegie Borough received $250,000 a sewer separation project on Diamond Alley.
• Neville Township received $200,000 for a waterline replacement on Riverside Place.
• Stowe Township received $200,000 for a catch basin replacement project.
• Emsworth Borough received $170,000 for sanitary sewer improvements along Center Avenue.
• Avalon Borough received $100,000 for sanitary sewer repairs.
• Reserve Township received $80,000 for sanitary sewer lining.
The grant awards that the CFA approved comes from President Biden’s American Rescue Plan Act, a portion of which the General Assembly directed into the state’s existing H2O PA program for single- or multi-year clean water infrastructure construction projects and the Small Water and Sewer grant program for small water, sewer, storm sewer, and flood control projects.
Jim Price
Borough Manager
wwwcraftonborough.com
This notification was posted by Borough of Crafton. Borough of Crafton is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.