Rt. 22 Construction Update-Reminder

From
Wilkins

Wilkins Logo

Sent
Fri, Aug 11 @ 9am

Where
View on Map

Description
Golden Triangle Construction Company will be starting the Hall Station Bridge work on the Business 22 project. This bridge is located between the Home Depot & Sam’s Cub Intersections. Starting 8/12/23 traffic will be reduced to one 11’ lane in each direction onto the westbound half of the bridge while they work on the eastbound side. This condition will last for about 1-1/2 months; then they will switch again to work on the other half of the bridge for another 1-1/2 months. There are no closures or detours, but there will be a Construction Shuttle Bus operating from 6:00 AM to 10:00 PM for the first phase because the sidewalk will be closed. The shuttle will transport the pedestrians to and from the two intersections.

This notification was posted by Wilkins. Wilkins is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.

Back to Wilkins's Calendar