Water Main Project Bids Wanted

From
Dover Township

Dover Township Logo

Sent
Tue, Mar 28 @ 8:31am

Description
LOCATION OF WORK:
Connection of 8? water main from Summer Dr to Fox Chase Dr. – Items 1A- 1J Project will start between lot 206 & 205 in Seasons Development. The project will continue east through the field between 3655 and 3668 Fox Chase Dr. with the a tie in the blacktop.

DESCRIPTION OF WORK:
Mobilize, furnish and install E&S controls, install supplied ductile iron pipe, supplied sleeve, bends, mega lugs, locking rubbers, 8? valve, valve box, and aggregate from Summer Dr to Fox Chase Dr. Furnish materials to perform final grading, fertilization, seeding, mulching, blanketing, (3 pages attached) paving and demobilization. Dover township has construction and permanent right of ways, see attached plan and profile. This construction is subject to the provisions of the Pennsylvania Prevailing Wage Act. PA Prevailing Wage shall be paid to construction workers, laborers, and mechanics involved in this pipe project. Project Serial # is 23-01479. (9 pages attached)

Bid Documents - https://www.dovertownship.org/wp-content/uploads/2023/03/Water-Main-Project-Bid-Documents.pdf

This notification was posted by Dover Township. Dover Township is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.

Back to Dover Township's Calendar