S. Linwood Avenue/Union Avenue - Road Work Update 2/27/2023

From
Borough of Crafton

Borough of Crafton Logo

Sent
Mon, Feb 27 @ 8:25am

Description

Pennsylvania American Water and Peoples Natural Gas (PNG) have finished their main line replacements on South Linwood Avenue and Union Avenue. The temporary road patching will remain in place until the permanent paving can be done in the spring. South Linwood Avenue will be paved (curb to curb) from Ewing Rd to Crafton Blvd in early spring. The Borough will then be resurfacing the entire area of Union Avenue (Steuben to Cross) in asphalt during the late spring. PNG will be reimbursing the Borough for its section of restoration.


Douglas Sample
Assistant Manager
100 Stotz Avenue
Pittsburgh, PA 15205
412-921-0752 ext. 16

This notification was posted by Borough of Crafton. Borough of Crafton is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.

Back to Borough of Crafton's Calendar