ALERT: E Steuben Street Road Work

From
Borough of Crafton

Borough of Crafton Logo

Sent
Mon, Jan 23 @ 3:23pm

Where
View on Map

Description
Crafton Borough’s contractor will be repairing a broken manhole located near 1 East Steuben Street (near intersection with Lincoln Avenue) on the morning of January 24th, 2023. Construction will start at 9 AM and last approximately 4 hours. An alternating traffic pattern will be controlled by flaggers during construction. Work zone safety is a priority. Motorists should slow down, follow posted speed limits, pay attention, watch out for workers, obey signs and flaggers, and allow additional travel time for delays.

Douglas Sample
Assistant Manager
100 Stotz Avenue
Pittsburgh, PA 15205
412-921-0752 ext. 19

This notification was posted by Borough of Crafton. Borough of Crafton is solely responsible for this notification and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this notification.

Back to Borough of Crafton's Calendar