Work Schedule For Week of 9/16-9/20

From Clayton
When Mon, Sep 16, 2019 @ 7am to Fri, Sep 20, 2019 @ 5pm
Where
View on Map

For the week of September 16th, the following work items are planned:
1. Continued mobilization of contractor equipment and materials
2. Continuation of tree cutting including stump removals along James Street, Riverside Drive and Webb Street
3. Parking meter removals along Riverside Drive
4. Television inspection and recording of various sewer and drainage lines
5. Waterline work along James Street between Hugunin Street and Riverside Drive

This event was posted by Clayton. Clayton is solely responsible for this event and unless specifically indicated, no other community or individual utilizing Savvy Citizen is sponsoring, responsible for, or endorsing this event.

Facebook Messenger Twitter LinkedIn Pinterest Email

Back to Event | Back to Clayton's Calendar